| FIND OUT WHAT WE DO |
Homes Jobs Infrastructure |
|
 |
Outline Water Cycle Strategy 2009
Outline Water Cycle Strategy 2009 Appendices A - I
Outline Water Cycle Strategy 2009 Appendix J
Please note that this file is best printed on A3 paper.
For higher resolution images of the maps contained within the Water Cycle Strategy please click on the links below.
WCS figure 4.4 CAMS classifications water availability
WCS figure 5.1 Major developments and WwTW locations
WCS figure 5.3 Mid Beds Existing sewer network
WCS figure 5.3 Mid Beds Existing sewer network
WCS figure 6.2 Bedford Borough Environment Agency Flood Zones
WCS figure 6.3 Bedford Borough Strategic Flood Risk Assessment Flood Risk Zones
WCS figure 6.4 Map of Environment Agency Flood Risk Assessment Zones in Mid Beds District
WCS figure 6.5 Bedford Group of Drainage Boards District area
WCS figure 7.1 Groundwater source protection zones
WCS figure 8.1 Bedford Borough Water Related Ecology
WCS figure 8.2 Mid Beds Water Related Ecology
|